February 2, 2007
According to Granbury ISD Facilities Director Randy Leach, the EOG well site recently passed a safety inspection conducted by the Texas Railroad Commission. It was also determined that the site was located the required legal distance from the school property. EOG has placed an orange vinyl fencing material to separate the property line and drill site.